贾江涛 1, 翟桥柱 1, 管晓宏 1, 等. 水库群水电站短期调度的整数规划方法[J]. 西安交通大学学报, 2008,42(8):1006-1009.
贾江涛 1, 翟桥柱 1, 管晓宏 1, et al. Mixed Integer Programming Based Method for Short-Term Scheduling of Hydroelectric Plants[J]. 2008, 42(8): 1006-1009.
针对水库群水电站短期调度问题
在综合考虑非线性水电转换关系、机组最小开关机时间、水流延时、库容及河道容量约束等众多因素的情况下
建立了一种混合整数规划调度模型.引入了最小开关机时间约束
以限制机组频繁启停.对非线性水电转换关系采用分段线性化方法
通过引入辅助整数变量将模型转换为线性混合整数规划问题
在此基础上采用CPLEX优化软件包求解.对包含3个水库12台机组的一个模拟系统的测试结果表明
所建模型及相关的线性化方法能灵活处理水库群水电站短期调度中的多种复杂因素.
The scheduling problem for short-term hydroelectric plants is studied. The nonlinear hydroelectric production functions
minimum-down/up time of hydro units
time delay between reservoirs and capacity limits of reservoirs and rivers are all considered in the model and a mixed integer programming is then formulated. Constraints on minimum-down/up time are added to prevent the units from being started-up/shut-down frequently. The nonlinear hydroelectric production functions are replaced by piecewise linear approximations and auxiliary integer variables are introduced such that the problem is re-formulated as a mixed integer linear programming. CPLEX package is adopted to solve the problem. Numerical testing results for a system with 3 reservoirs and 12 hydro units show that the model and the piecewise linear approximation techniques work well with the complex formulation of short-term hydroelectric plants scheduling.
LI Chao'an, JAP P J, STREIFFERT D L. Implementation of network flow programming to the hydrothermal coordination in an energy management system [J].IEEE Trans on Power Systems, 1993,8(3):1045-1053.
RUZIC S, RAJAKOVIC N. A flexible approach to short-term hydrothermal coordination: part Ⅰ part Ⅱ[J].IEEE Trans on Power Systems,1996,11(3):1564-1578.
SWARUP K S, YAMASHIRO S. Unit commitment solution methodology using genetic algorithm[J]. IEEE Trans on Power Systems, 2002,17(1):87-91.
GUAN Xiaohong, LUH P B, YAN Houzhong, et al. Optimization-based scheduling of hydrothermal power systems with pumped-storage units [J]. IEEE Trans on Power Systems, 1994,9(2):1023-1031.
NI Ernan, GUAN Xiaohong, LI Renhou. Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs [J]. IEEE Trans on Power Systems, 1999, 14(3):1127-1132.
翟桥柱.电力系统优化调度模型与算法研究 [D]. 西安:西安交通大学电子与信息工程学院,2005.
FINARDI E C, da SILVA E L. Unit commitment of single hydroelectric plant[J]. Electric Power System Research, 2005,75(2/3):116-123.
CHANG G W, AGANAGIC M, WAIGHT J G, et al. Experiences with mixed integer linear programming based approaches on short-term hydro scheduling[J]. IEEE Trans on Power Systems, 2001, 16(4):743-749.
WINSTON W L. Operations research mathematical programming [M]. 北京:清华大学出版社,2003.
GUAN Xiaohong, ZHAI Qiaozhu, PAPALEXOPOULOS A. Optimization based methods for unit commitment: Lagrangian relaxation versus general mixed integer programming [C]∥2003 IEEE Power Engineering Society General Meeting. Piscataway, NJ, USA: IEEE, 2003: 1095-1100.