您当前的位置:
首页 >
文章列表页 >
Construction Method of Flexible Operation Domain for Renewable Energy Considering Potential Balance Risks of the System
更新时间:2025-09-28
    • Construction Method of Flexible Operation Domain for Renewable Energy Considering Potential Balance Risks of the System

    • Journal of Xi'an Jiaotong University   Vol. 59, Issue 10, Pages: 44-53(2025)
    • DOI:10.7652/xjtuxb202510004    

      CLC: TM732
    • Received:24 January 2025

      Published:10 October 2025

    移动端阅览

  • QI Jie, WANG Jianxue, GONG Leteng, et al. Construction Method of Flexible Operation Domain for Renewable Energy Considering Potential Balance Risks of the System[J]. Journal of Xi'an Jiaotong University, 2025, 59(10): 44-53. DOI: 10.7652/xjtuxb202510004.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

12

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Influence of Structural Parameters on the Summer Operational Characteristics of a Three-Tower-in-One Indirect Air-Cooling System
Effects of Expansion Angle Crater Film Hole on the Film Cooling Characteristics of a Double-Wall Structure
Review of the Application of EBSILON Software in Combined Heat and Power System Optimization
Mechanism and Optimal Control Strategy for Hysteresis in Rapid Dehumidification Response of Indirect Thermal Systems in Electric Vehicles
Effects of Steam Addition on the Swirl Combustion and Emission Characteristics of Cracked Ammonia

Related Author

No data

Related Institution

No data
0