您当前的位置:
首页 >
文章列表页 >
Performance Analysis of Supercritical CO2 Lignite-Fired Power Plant Integrated with Gas Extraction Pre-Drying System
更新时间:2025-07-09
    • Performance Analysis of Supercritical CO2 Lignite-Fired Power Plant Integrated with Gas Extraction Pre-Drying System

    • Vol. 57, Issue 1, Pages: 78-86(2023)
    • DOI:10.7652/xjtuxb202301008    

      CLC: TK114
    • Online First:10 January 2023

      Published:2023

    移动端阅览

  • ZHANG Xuwei, BAI Wengang, GAO Wei, et al. Performance Analysis of Supercritical CO2 Lignite-Fired Power Plant Integrated with Gas Extraction Pre-Drying System[J]. 2023, 57(1): 78-86. DOI: 10.7652/xjtuxb202301008. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

19

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Energy Efficiency Optimization of the Cryogenic Air Separation Process for Electronic-Grade Ultra Pure Nitrogen
Performance Improvement of Liquid Compressed CO2 Energy Storage System Based on Heat Storage and Exchange Unit Optimization
Theoretical Study on Pre-Dried Lignite-Fired Power Generation System
Simulation for Off-Design Performances of Flue Gas Pre-Dried Lignite-Fired Power System
A Structure-Semantics-Residual Collaborative Image Compression Framework:Towards Privacy Protection and High-Fidelity Reconstruction

Related Author

LIU Yunsheng
PU Liang
YU Zhipeng
XU Feng
ZENG Haitao
YAO Keying
DU Shen
LIU Zhanbin

Related Institution

School of Energy and Power Engineering,Xi'an Jiaotong University
Prochip Gas(Shanghai)Co.,Ltd.
MOE Key Laboratory of Cryogenic Technology and Equipment,Xi'an Jiaotong University
Jiangxi Zhuochao Technology Co.,Ltd.
School of Future Technology, Xi'an Jiaotong University
0