Comparison of Mechanical Performances Between the Two-Stage Cutterhead and the Flat-Face Cutterhead for Rock Tunnel Boring Machine[J]. 2015, 49(3): 121-128.
DOI:
Comparison of Mechanical Performances Between the Two-Stage Cutterhead and the Flat-Face Cutterhead for Rock Tunnel Boring Machine[J]. 2015, 49(3): 121-128.DOI: 10.7652/xjtuxb201503019.
Comparison of Mechanical Performances Between the Two-Stage Cutterhead and the Flat-Face Cutterhead for Rock Tunnel Boring Machine
In order to overcome the drawbacks that large cutting load and eccentric load on the TBM's large diameter(>10 m)flat-face cutterhead that will cause excessive deformation of the cutterhead and damage of the main bearing
a two-stage cutterhead was introduced. The two-stage cutterhead was designed in grey relational analysis method based on the flat-face cutterhead applied in West Qinling tunnel project. The mechanical performance analysis models of the flat-face cutterhead and the two-stage cutterhead under the mixed-face rock ground condition were built to compare the cutterheads' rock cutting thrusts and torques
as well as the eccentric forces and moments. And finite element models of the two cutterheads under uniform rock ground condition were built to compare the cutterheads' deformation and stress distribution. The results show that the rock cutting thrust
the rock cutting torque
the eccentric force and moment
the deformation and maximum stress of the two-stage cutterhead are smaller than that of flat-face cutterhead
which illustrates that the rock cutting loads are distributed into two stages of the cutterhead
and at the same time
the stiffness of the cutterhead is increased and the stress concentration and eccentric load of the cutterhead were also decreased.
ZHANG Hongxing, ZHANG Ningchuan. Brief discussion on cutterhead vibration of type 803E TBM [J]. Tunnel Construction, 2007, 27(6): 76-79.
HUO Junzhou, SUN Wei, CHEN Jing, et al. Disc cutters plane layout design of the full-face rock tunnel boring machine(TBM)based on different layout patterns [J]. Computers Industrial Engineering, 2011, 61(4): 1209-1225.
HUO Junzhou, SUN Wei, CHEN Jing, et al. Optimal disc cutters plane layout design of the full-face rock tunnel boring machine(TBM)based on a multi-objective genetic algorithm [J]. Journal of Mechanical Science and Technology, 2010, 24(2): 521-528.
LI Zhen, HUO Junzhou, SUN Wei, et al. Cutterhead structure optimal design of the full-face rock tunnel boring machine [J]. Machine Design and Research, 2011, 27(1): 83-90.
邓聚龙. 灰色系统基本方法 [M]. 武汉: 华中科技大学出版社, 1987: 112-138.
KUO Y, YANG T, HUANG G. The use of grey relational analysis in solving multiple attribute decision-making problems [J]. Computers Industrial Engineering, 2008, 55(1): 80-93.
LIU Jingchun, JIA Hanfei, ZHANG Lihua. Brief introduction to the cutterhead of full-face rock tunnel boring machine [J]. Heavy Industrial Hoisting Machinery, 2006, 10(2): 1-4.