您当前的位置:
首页 >
文章列表页 >
Optimal Location and Staged Installation of Phasor Measurement Unit for Complete Observability
更新时间:2025-12-08
    • Optimal Location and Staged Installation of Phasor Measurement Unit for Complete Observability

    • Vol. 41, Issue 8, Pages: 959-963+990(2007)
    • CLC: TM734
    • Online First:10 August 2007

      Published:2007

    移动端阅览

  • 刘杰 1, 李建华 1, 焦莉 2, et al. Optimal Location and Staged Installation of Phasor Measurement Unit for Complete Observability[J]. 2007, 41(8): 959-963+990. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

6

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

An Online Transient Stability Control Strategy Based on Post-Disturbance Equilibrium Point Continuation: Calculation of Post-Disturbance Equilibrium Points
Design for New Bridge High Temperature Superconducting Fault Current Limiter
Fast Search for Islanding Strategy Based on Self-Adaptive System Islanding
A Novel Volterra Prediction Model for Power System Short-Term Load Prediction
A Fast Calculation Method for Thermal Flow Fields in Transformer Windings Based on PI-DeepONet

Related Author

DUAN Chao
GAO Qin
LI Shiyang
LIU Yuming
HE Jingjie
ZHANG Jianxin
LI Chongtao
褚建峰 1

Related Institution

Power Dispatching and Control Center, China Southern Power Grid
Electric Power Research Institute, China Southern Power Grid
State Key Laboratory of Electrical Insulation and Power Equipment, Xi'an Jiaotong University
School of Electronics and Control, Chang'an University
0