您当前的位置:
首页 >
文章列表页 >
Long Term Optimal Energy Allocating for Hydropower Plant Based on Parameter Adjusting Strategy
更新时间:2025-12-08
    • Long Term Optimal Energy Allocating for Hydropower Plant Based on Parameter Adjusting Strategy

    • Vol. 42, Issue 8, Pages: 1010-1014+1058(2008)
    • CLC: TM77
    • Online First:10 August 2008

      Published:2008

    移动端阅览

  • 曾勇红, 刘柱, 王锡凡, et al. Long Term Optimal Energy Allocating for Hydropower Plant Based on Parameter Adjusting Strategy[J]. 2008, 42(8): 1010-1014+1058. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

5

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Allocation Methods for Reserve Cost in Regional Power Market
Effects of Steam Addition on the Swirl Combustion and Emission Characteristics of Cracked Ammonia
Knowledge Graph Representation Learning Driven by Semantic Discrimination and Subgraph Integration
Integrated and Joint Design Optimization of Centrifugal Compressor Impeller and Casing Treatment at Multiple Working Points
Study on the Thermodynamic Properties in the Anomalous Region of Supercritical Water

Related Author

王建学
王锡凡
邱伟
冯长有

Related Institution

No data
0