Long Term Optimal Energy Allocating for Hydropower Plant Based on Parameter Adjusting Strategy
|更新时间:2025-12-08
|
Long Term Optimal Energy Allocating for Hydropower Plant Based on Parameter Adjusting Strategy
Vol. 42, Issue 8, Pages: 1010-1014+1058(2008)
作者机构:
西安交通大学电气工程学院,西安,710049
作者简介:
基金信息:
DOI:
CLC:TM77
Online First:10 August 2008,
Published:2008
稿件说明:
移动端阅览
曾勇红, 刘柱, 王锡凡, et al. Long Term Optimal Energy Allocating for Hydropower Plant Based on Parameter Adjusting Strategy[J]. 2008, 42(8): 1010-1014+1058.
DOI:
曾勇红, 刘柱, 王锡凡, et al. Long Term Optimal Energy Allocating for Hydropower Plant Based on Parameter Adjusting Strategy[J]. 2008, 42(8): 1010-1014+1058.DOI:
Long Term Optimal Energy Allocating for Hydropower Plant Based on Parameter Adjusting Strategy
a long term hydroelectricity energy trading model with profit maximization is proposed
where the tradeoff among the bilateral contract market
spot market and reserve market is conducted simultaneously. AR(1)is used for predicting the market clearing price and value at risk measures for the volatile risk of electricity price. The proposed model is solved by the principle of decomposition and coordination for large scale system to obtain the optimal contract discharge to the overall benefit and optimal allocating strategy in the upper sub-problem
and the optimal discharge in spot and spinning reserve market can be considered in the low sub-problem. By adjusting parameters
the model can provide optimal energy allocation for hydropower plants with different risk preference as facing the same electricity contract
or for a certain plant facing contract with various prices.
关键词
Keywords
references
DENTON M, PALMER A, MASIELLO R, et al. Managing market risk in energy[J]. IEEE Transactions on Power Systems, 2003, 18(2): 494-502.
CHEN Jianchun, MA Guangwen, WANG Li, et al. Optimal operation of cascade hydropower plants in competitive electricity market[J]. Journal of Hydroelectric Engineering, 2004, 23(8):11-15.
CONEJO A J, CONTRERAS J M, VILLAMOR F A. Self-scheduling of a hydro producer in a pool-based electricity market [J]. IEEE Transactions on Power Systems, 2002, 17(4):1265-1272.
LI Qiujun, WU Yonggang, REN Guangyu. Discussion on the optimal operation mode of hydropower in electricity market[J]. Central China Electric Power, 2007, 19(3): 4-7.
ZHANG Xian, WANG Xifan, WANG Jianxue, et al. A long-term allocating strategy of power generators[J]. Proceedings of the CSEE, 2005, 25(1): 6-12.
CAMPO R A. Probabilistic optimality in long-term energy sales[J]. IEEE Transactions on Power Systems, 2002, 17(2):237-242.
CONEJO A J, NOGALES F J, ARROYO J M, et al. Risk-constrained self-scheduling of a thermal producer[J]. IEEE Transactions on Power Systems, 2004, 19(3): 1569-1574.
IIVO V C, JUSSI K. Managing electricity market price risk[J]. European Journal of Operational Research, 2003, 145(1):137-147.
ZHANG Yanke, WANG Liping, LI Anqiang,et al. Risk analysis model of bidding energy for hydropower plants and its application [J]. Hydropower Automation and Dam Monitoring, 2006, 30(6): 27-30.
LASDON L S. Optimization theory for large systems[M]. New York, USA:Courier Dover Publications, 2002.