According to the impacts of unit maintenance on the system operation costs
a novel unit maintenance scheduling(UMS)model is proposed in a competitive environment. Based on the system reliability assessment
the minimized total system costs over the entire horizon is taken as the objective
and the constraints of the system loss of load probability(LOLP)
power flow and maintenance outage are considered completely. Compared with the existing models
the proposed scheme takes the influence of bilateral contracts and energy market as well as random failures of generating units and transmission lines into consideration. Additionally
the system reliability index is converted into the economic index as a part of the objective
and evaluated by Monte Carlo approach. The simulation results illustrate that the present model ensures the system LOLP to be kept under the pre-set tolerance value with a steady outage planning cost.
关键词
Keywords
references
王锡凡.电力系统优化规划[M].北京:水利电力出版社,1990.
CONEJO A J, GARCIA B R, SALAZAR M D. Generation maintenance scheduling in restructured power system [J].IEEE Trans on Power Systems,2005,20(2):984-992.
FENG Yongqing,WU Wenchuan,ZHANG Boming,et al.Hydro-thermal generator maintenance scheduling based on credibility theory [J].Proceedings of CSEE,2006,26(13):14-19.
LEOU R C.A new method for unit maintenance scheduling considering reliability and operation expense [J].Electrical Power Energy Systems,2006,28(7): 471-481.
DAHAL K P, CHAKPITAK N.Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches [J].Electric Power Systems Research,2007,77(7):771-779.
MARWALI M K C, SHAHIDEHPOUR S M.Long-term transmission and generation maintenance scheduling with network, fuel and emission constraints [J].IEEE Trans on Power Systems,1999,14(3):1160-1165.
别朝红.电力系统灾难性事故和可靠性评估的研究 [D].西安:西安交通大学电气工程学院,1998.
Reliability Test System Task Force. The IEEE reliability test system-1996[J].IEEE Trans on Power Systems,1999,14(3):1010-1020.